The slope of the outlet of 'P trap' below the horizontal is kept 8° 14° 10° 12° TRUE ANSWER : ? YOUR ANSWER : ?
The measurement is not made in square meters in case of Form works R.C. Chhajja P.C. (Damp proof course) Concrete Jeffries TRUE ANSWER : ? YOUR ANSWER : ?
The order of booking dimensions is None of these Length, breadth, height Height, breadth, length Breadth, length, height TRUE ANSWER : ? YOUR ANSWER : ?
The measurement is made in square metre in case of R.C.C. structure None of these Hollow concrete block wall Cement concrete in foundation TRUE ANSWER : ? YOUR ANSWER : ?
The reduced levels of points, 30 metres apart along the longitudinal section of a road portion between chainages 5 and 9 are shown in the given figure. If there is a uniform up-gradient of the road 120 in 1, the chainage of the point with no filling or cutting is (6 + 12) chains (6 + 18) chains None of these (6 + 15) chains TRUE ANSWER : ? YOUR ANSWER : ?
Pick up the excavation where measurements are made in square meters for payment. Surface dressing up to 15 cm depths Surface excavation up to 30 cm depths Both (B) and (C) Ordinary cuttings up to 1 m TRUE ANSWER : ? YOUR ANSWER : ?
The main factor to be considered while preparing a detailed estimate, is Availability of materials All of these Transportation of materials Quantity of the materials TRUE ANSWER : ? YOUR ANSWER : ?
Cost of fittings and their fixing is specified for the following sanitary fittings All listed here Water closets Flushing pipes Lavatory basins TRUE ANSWER : ? YOUR ANSWER : ?
The most reliable estimate is Preliminary estimate Cube rate estimate Detailed estimate Plinth area estimate TRUE ANSWER : ? YOUR ANSWER : ?
The cross-section of a road partly in banking and partly in cutting is shown in the given figure. The area of the shaded portion is ⅓ × (b - rd)²/(s - r) ⅓ × (b - rd)²/(r + s) ⅓ × (b - rd)²/(r - s) ½ × (b + rd)²/(r - s) TRUE ANSWER : ? YOUR ANSWER : ?