The main factor to be considered while preparing a detailed estimate, is Transportation of materials Quantity of the materials Availability of materials All of these TRUE ANSWER : ? YOUR ANSWER : ?
As per Indian Standard Specifications, the peak discharge for domestic purposes per capita per minute, is taken 1.80 liters for 5 to 10 users 1.35 for 20 users All of these 1.20 liters for 15 users TRUE ANSWER : ? YOUR ANSWER : ?
In the mid-section formula All of these The volume of the earth work is calculated by multiplying the mid-section area by the distance between the two original sections The area of mid-sections is calculated by using mean depth The mean depth is the average of depths of two consecutive sections TRUE ANSWER : ? YOUR ANSWER : ?
The expected out turn of half brick partition wall per mason per day is 2.0 m2 1.5 m2 5.0 m2 4.0 m2 TRUE ANSWER : ? YOUR ANSWER : ?
While preparing a detailed estimate Volume should be measured correct to 0.01 cum Area should be measured correct to 0.01 sqm Dimension should be measured correct to 0.01 m All of these TRUE ANSWER : ? YOUR ANSWER : ?
While estimating the qualities for the construction of a building, the correct metric unit is Meter for length Liter for capacity Square meters for volume Cubic metre for area TRUE ANSWER : ? YOUR ANSWER : ?
The trap which is provided to disconnect the house drain from the street sewer is called Interception manhole All listed here Intercepting trap Master trap TRUE ANSWER : ? YOUR ANSWER : ?
The ground surface slopes 1 in 50 along a proposed railway embankment 150 m in length. The height of the embankment at zero chainage is 0.5 m, the width is 11 m and side slopes 2:1. If the falling gradient of the embankment is 1 in 150, the quantity of the earthwork calculated by Prismoidal formula, is 3275 m³ 3225 m³ 3250 m³ 3300 m³ TRUE ANSWER : ? YOUR ANSWER : ?
Berms are provided in canals if these are All of these Partly in excavation and partly in embankment Fully in excavation Fully in embankment TRUE ANSWER : ? YOUR ANSWER : ?
Anti-siphonage pipe is connected to Top of P trap W.C. Bottom of P trap W.C. Side of water closet Main soil pipe TRUE ANSWER : ? YOUR ANSWER : ?