One kilowatt-hour is? 1.6 mega joules None of these 3.6 mega joules 2.6 mega joules TRUE ANSWER : ? YOUR ANSWER : ?
Which of the following is not a part of transformer installation? Exciter Breather Conservator Buchholz Relay TRUE ANSWER : ? YOUR ANSWER : ?
The permissible voltage variation in transmission and distribution system is: ± 0.1% ±10% ± 25% ± 1% TRUE ANSWER : ? YOUR ANSWER : ?
Wave trap is used to trap waves of: None of these Higher frequencies entering generator or transformer units All of these Power frequencies TRUE ANSWER : ? YOUR ANSWER : ?
Transformer has _____ Auxiliary winding and secondary winding None of these Primary winding and secondary winding Primary winding and Auxiliary winding TRUE ANSWER : ? YOUR ANSWER : ?
The process of a computer receiving information from a server via Internet is known as: All of these Retrieving Downloading Uploading TRUE ANSWER : ? YOUR ANSWER : ?
Step-down transformer converts high voltage and low current into: Low voltage and high current None of these How voltage and high current High voltage and low current TRUE ANSWER : ? YOUR ANSWER : ?
Transformer core is laminated to _____ Reduce copper losses Reduce hysteresis loss Reduce eddy current losses Reduce all above losses TRUE ANSWER : ? YOUR ANSWER : ?
The Electricity Act is an Act of _____of India enacted to transform the power sector in India. All of these The Parliament A State resolution None of these TRUE ANSWER : ? YOUR ANSWER : ?
The arc temperature in Oil Circuit Breaker may reach up to _____ None of these 5,000° K 8,000° K 10,000° K TRUE ANSWER : ? YOUR ANSWER : ?