Industrial Engineering and Production Management Process layout is employed Where similar jobs are manufactured on similar machines All of these Where machines are arranged on functional basis Where low volume of production is required Where similar jobs are manufactured on similar machines All of these Where machines are arranged on functional basis Where low volume of production is required ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Military organisation is known as Functional organisation Line and staff organisation Line organisation All of these Functional organisation Line and staff organisation Line organisation All of these ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Slack represents the difference between the Normal allowable time and the latest expected time Proposed allowable time and the earliest expected time Latest allowable time and the normal expected time Latest allowable time and the earliest expected time Normal allowable time and the latest expected time Proposed allowable time and the earliest expected time Latest allowable time and the normal expected time Latest allowable time and the earliest expected time ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Which of the following incentive plans ensures a part of the swing to the worker and rest to the employer? Gilbert plan Taylor plan Emerson efficiency plan Halsey premium plan Gilbert plan Taylor plan Emerson efficiency plan Halsey premium plan ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management In time study, the rating factor is applied to determine Normal time of a worker Fixation of incentive rate Standard time of a job Merit rating of the worker Normal time of a worker Fixation of incentive rate Standard time of a job Merit rating of the worker ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management A PERT network has three activities on critical path with mean time 3, 8 and 6 and standard deviations 1, 2 and 2 respectively. The probability that the project will be completed in 20 days is 0.84 0.95 0.5 0.66 0.84 0.95 0.5 0.66 ANSWER DOWNLOAD EXAMIANS APP