Power Systems NTPC (National Thermal Power Cooperation) has its only thermal power generating unit in West Bengal at Katwa. Bakreshwar. Durgapur. Farakka. Katwa. Bakreshwar. Durgapur. Farakka. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Maximum power transfer in a transmission line can be obtained by either 1 or 2 increasing voltage level None of these reducing reactance either 1 or 2 increasing voltage level None of these reducing reactance ANSWER DOWNLOAD EXAMIANS APP
Power Systems A power generating station has a plant capacity of 200 MW and maximum power demand is 150 MW. If average power generation is 110 MW, then find the load factor and capacity factor respectively? 0.55 and 0.733 0.65 and 0.55 0.733 and 0.65 0.733 and 0.55 0.55 and 0.733 0.65 and 0.55 0.733 and 0.65 0.733 and 0.55 ANSWER DOWNLOAD EXAMIANS APP
Power Systems A transmission line has an impedance of (2+j6) Ω has voltage regulation of 10% at a load power factor of 0.8 lag. Find the voltage regulation for a load of 0.6 lead -6.92% 10% 6.92% -10% -6.92% 10% 6.92% -10% ANSWER DOWNLOAD EXAMIANS APP
Power Systems On a power system network the load is increasing represents the value of impedance increase. none of above. remains constant. decrease. increase. none of above. remains constant. decrease. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Specified quantities of slack bus are P and V P and Q P and δ V and δ P and V P and Q P and δ V and δ ANSWER DOWNLOAD EXAMIANS APP