Process Equipment and Plant Design Normal screwed fittings are used for pipes upto a diameter of __________ inches. 7 3 5 1.5 7 3 5 1.5 ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design The testing pressure of storage tanks and pressure vessels designed as per Indian standard codes should be about __________ times.the design pressure. 1.5 to 2 >5 4 to 5 3 to 4 1.5 to 2 >5 4 to 5 3 to 4 ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design In a multipass shell and tube heat exchanger, the shell side cross flow area does not depend upon Clearance Pitch Baffle spacing None of these Clearance Pitch Baffle spacing None of these ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design A high vapour velocity is required for high plate efficiency in a seive plate coloumn. The satisfactory value of operating vapor velocity for design purpose in seive plate column is about __________ percent of the flooding velocity. 45 60 80 95 45 60 80 95 ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design Optimum reflux ratio in a continuous distillation column is determined by the None of these Total cost consideration (fixed cost of the column plus the cooling water & steam cost) Maximum permissible vapour velocity Flooding limit of the column None of these Total cost consideration (fixed cost of the column plus the cooling water & steam cost) Maximum permissible vapour velocity Flooding limit of the column ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design The ratio of volumes of the mixed reactor to the plug flow reactor (for identical feed composition, flow rate, conversion, and for all positive reaction orders) is always < 1 1 Equal to the order of reaction >1 < 1 1 Equal to the order of reaction >1 ANSWER DOWNLOAD EXAMIANS APP