Industrial Engineering and Production Management Motion study involves analysis of Tooling and equipment Actions of operator Layout of work place All of these Tooling and equipment Actions of operator Layout of work place All of these ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management The important file in making a PERT is Length of arrow has nothing to do with time All of the these An event can't be accomplished until activities leading to it are completed No activity from any event can be started from preceding event till it is completed Length of arrow has nothing to do with time All of the these An event can't be accomplished until activities leading to it are completed No activity from any event can be started from preceding event till it is completed ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Break-even analysis consists of Fixed and variable costs Operation costs Variable cost Fixed cost Fixed and variable costs Operation costs Variable cost Fixed cost ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management The simplex method is the basic method for Linear programming Value analysis Operation research Model analysis Linear programming Value analysis Operation research Model analysis ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management A PERT network has three activities on critical path with mean time 3, 8 and 6 and standard deviations 1, 2 and 2 respectively. The probability that the project will be completed in 20 days is 0.66 0.5 0.84 0.95 0.66 0.5 0.84 0.95 ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management String diagram is used when Idle time is to be reduced All of these Team of workers is working at a place Material handling is to be done Idle time is to be reduced All of these Team of workers is working at a place Material handling is to be done ANSWER DOWNLOAD EXAMIANS APP