Industrial Engineering and Production Management Activity slack or float of any event on a PERT/CPM chart is represented by Anyone of the above Latest finish time of event earliest finish time of the event Latest start time of succeeding event earliest finish time of preceding event activity time Latest start time of the event earliest start time of the event Anyone of the above Latest finish time of event earliest finish time of the event Latest start time of succeeding event earliest finish time of preceding event activity time Latest start time of the event earliest start time of the event ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Work study is concerned with Improving production planning and control Motivation of workers Improving present method and finding standard time Improving production capability Improving production planning and control Motivation of workers Improving present method and finding standard time Improving production capability ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Standard time is equal to Representative time multiplied by rating factor (Normal time) - (allowances) (Normal time) + (allowances) Normal time taken by an operation Representative time multiplied by rating factor (Normal time) - (allowances) (Normal time) + (allowances) Normal time taken by an operation ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management When slack of an activity is positive The activity is critical and any delay in its performance will delay the completion of whole project It represents that a programme falls behind schedule and additional resources are required to complete the project in time It represents a situation where extra resources are available and the completion of project is not delayed Any one of the above The activity is critical and any delay in its performance will delay the completion of whole project It represents that a programme falls behind schedule and additional resources are required to complete the project in time It represents a situation where extra resources are available and the completion of project is not delayed Any one of the above ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management If TL is the largest allowable event occurrence time, total activity slack (s) is equal to Latest finish time earliest finish time (EFT) Latest start time earliest start time TLEFT All of these Latest finish time earliest finish time (EFT) Latest start time earliest start time TLEFT All of these ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management TMU in method time measurement stands for Time motion unit Technique measurement unit Time movement unit Time measurement unit Time motion unit Technique measurement unit Time movement unit Time measurement unit ANSWER DOWNLOAD EXAMIANS APP