Irrigation Engineering A water-logged land is found suitable for cultivation due to Ease of tillage for preparation of the field for optimum condition of germination None of these Absence of aeration of soil from root zone of the plant Regular supply of water to plants from the water table by capillary action Ease of tillage for preparation of the field for optimum condition of germination None of these Absence of aeration of soil from root zone of the plant Regular supply of water to plants from the water table by capillary action ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering An outlet which maintains a constant discharge irrespective of fluctuation in the water levels of the supplying channel or water course, is known as Flexible modular outlet Non-modular outlet Semi-modular outlet Right modular outlet Flexible modular outlet Non-modular outlet Semi-modular outlet Right modular outlet ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering If L is total length of a canal in kilometers, P is total perimeter of its lining in metres and C is the cost of lining per square metre, the additional expenditure involved on lining, is 100 PLC PL/1000C PLC/1000 PC/100L 100 PLC PL/1000C PLC/1000 PC/100L ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering Which of the following methods is used to estimate flood discharge based on high water marks left over in the past ? area-velocity method moving boat method slope-area method ultra-sonic method area-velocity method moving boat method slope-area method ultra-sonic method ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The drainage water intercepting the canal can be disposed of by passing the canal below the drainage in level crossing super passage and canal syphon aqueduct and super passage aqueduct and syphon aqueduct level crossing super passage and canal syphon aqueduct and super passage aqueduct and syphon aqueduct ANSWER DOWNLOAD EXAMIANS APP