Airport Engineering International Civil Aviation Organization (I.C.A.O.) was set up at Montreal (Canada), in 1939 1950 1929 1947 1939 1950 1929 1947 ANSWER DOWNLOAD EXAMIANS APP
Airport Engineering The slope of the obstruction clearance line from the boundary of the heliport should be 0.047222222222222 0.069444444444444 0.043055555555556 0.045138888888889 0.047222222222222 0.069444444444444 0.043055555555556 0.045138888888889 ANSWER DOWNLOAD EXAMIANS APP
Airport Engineering Assertion A : The ratio of arriving and departing aircrafts influences the airport capacity: Reason R : Landing operation is generally given priority over the taking off operation. Select your answer based on the coding system given below: Both A and R is true and R is the correct explanation of A Both A and R is true and R is not the correct explanation of A A is false but R is true A is true but R is false Both A and R is true and R is the correct explanation of A Both A and R is true and R is not the correct explanation of A A is false but R is true A is true but R is false ANSWER DOWNLOAD EXAMIANS APP
Airport Engineering If lift off distance of an craft is 2000 m, the clear way at the end of the runway should not be less than 162.5 m 172.5 m 152.5 m 145 m 162.5 m 172.5 m 152.5 m 145 m ANSWER DOWNLOAD EXAMIANS APP
Airport Engineering As per ICAO recommendation, the rate of change of longitudinal gradient per 30 m length of vertical curve for A and B type of airports is limited to a maximum of 0.004 0.003 0.002 0.001 0.004 0.003 0.002 0.001 ANSWER DOWNLOAD EXAMIANS APP
Airport Engineering The threshold markings are All listed here 4 m wide 1 m clear space between adjacent Placed symmetrically on either side of the runway centre line All listed here 4 m wide 1 m clear space between adjacent Placed symmetrically on either side of the runway centre line ANSWER DOWNLOAD EXAMIANS APP