Industrial Engineering and Production Management Routing Is concerned with starting of processes Determines the programme for the operations Regulates the progress of job through various processes Prescribes the sequence of operations to be followed Is concerned with starting of processes Determines the programme for the operations Regulates the progress of job through various processes Prescribes the sequence of operations to be followed ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Actual performance of a task is called An activity An event None of these A duration An activity An event None of these A duration ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management The essential condition for the decompression of an activity is that An activity could be decompressed to the maximum extent of its normal time An activity could be decompressed to the maximum extent of its normal time After decompression the time of an activity invariably exceeds its normal time The project time should change due to decompression An activity could be decompressed to the maximum extent of its normal time An activity could be decompressed to the maximum extent of its normal time After decompression the time of an activity invariably exceeds its normal time The project time should change due to decompression ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management According to MAPI formula, the old machine should be replaced by new one when (Here, CAM = Challenger's Adverse minimum, DAM = Defender's Adverse minimum) CAM = DAM CAM > DAM There is no such criterion CAM < DAM CAM = DAM CAM > DAM There is no such criterion CAM < DAM ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Bar charts are suitable for Large projects Minor works Major works All of these Large projects Minor works Major works All of these ANSWER DOWNLOAD EXAMIANS APP