Industrial Engineering and Production Management
Routing

Prescribes the sequence of operations to be followed
Is concerned with starting of processes
Determines the programme for the operations
Regulates the progress of job through various processes

ANSWER DOWNLOAD EXAMIANS APP

Industrial Engineering and Production Management
The essential condition for the decompression of an activity is that

The project time should change due to decompression
An activity could be decompressed to the maximum extent of its normal time
After decompression the time of an activity invariably exceeds its normal time
An activity could be decompressed to the maximum extent of its normal time

ANSWER DOWNLOAD EXAMIANS APP