Industrial Engineering and Production Management Merit rating is the method of determining the Workers performance on a job Value of overall production Worth of a machine Relative values of a job Workers performance on a job Value of overall production Worth of a machine Relative values of a job ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Which of the following is independent of sales forecast? Production control Productivity Production planning Inventory control Production control Productivity Production planning Inventory control ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management In the Emerson efficiency plan, a worker receives only his daily wage and no bonus is paid till his efficiency reaches 0.6667 0.75 0.8 0.5 0.6667 0.75 0.8 0.5 ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management String diagram is used For checking the relative values of various layouts When a group of workers are working at a place All of these Where processes require the operator to be moved from one place to another For checking the relative values of various layouts When a group of workers are working at a place All of these Where processes require the operator to be moved from one place to another ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management In micro-motion study, therblig is described by A symbol An event Standard symbol and colour An activity A symbol An event Standard symbol and colour An activity ANSWER DOWNLOAD EXAMIANS APP