Industrial Engineering and Production Management Indirect expenses include Factory expenses Administrative expenses All of these Selling expenses Factory expenses Administrative expenses All of these Selling expenses ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management PMTP (predetermined motion time systems) include BNTS (basic motion time study) MTM (method time measurement) All of these WFS (work factor systems) BNTS (basic motion time study) MTM (method time measurement) All of these WFS (work factor systems) ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Inventory control in production, planning and control aims at Achieving optimization Acceptable customer service at low capital investment in inventory Ensuring against market fluctuations Discounts allowed in bulk purchase Achieving optimization Acceptable customer service at low capital investment in inventory Ensuring against market fluctuations Discounts allowed in bulk purchase ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Bar charts are suitable for Major works Minor works Large projects All of these Major works Minor works Large projects All of these ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management The main objective of work measurement is to Formulate a proper incentive scheme Plan and schedule of production Estimate the selling prices and delivery dates All of these Formulate a proper incentive scheme Plan and schedule of production Estimate the selling prices and delivery dates All of these ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Critical Path Net Work helps an engineer To concentrate his attention on critical activities To divert the resources from noncritical advanced activities to critical activities All of these To be cautious for avoiding any delay in the critical activities to avoid delay of the whole project To concentrate his attention on critical activities To divert the resources from noncritical advanced activities to critical activities All of these To be cautious for avoiding any delay in the critical activities to avoid delay of the whole project ANSWER DOWNLOAD EXAMIANS APP