RCC Structures Design
In testing a pile by load test, pile platform is loaded with one and half times the design load and a maximum settlement is noted. The load is gradually removed and the consequent rebound is measured. For a safe pile, the net settlement (i.e. total settlement minus rebound) per tonne of test load should not exceed

15 mm
20 mm
25 mm
10 mm

ANSWER DOWNLOAD EXAMIANS APP

RCC Structures Design
An R.C.C. lintel is spanning an opening of 2 m span in a brick wall. The height of the roof is 2.9 m above the floor level and that of the opening is 2.1 m above the floor level. The lintel is to be designed for self weight plus

Triangular load of the wall
Triangular load + load from the roof
UDL of wall + load from the roof
UDL of wall

ANSWER DOWNLOAD EXAMIANS APP