Waste Water Engineering In primary sedimentation, the 0.2 mm inorganic solids get separated if specific gravity is 2.65 2.5 2.25 2.55 2.65 2.5 2.25 2.55 ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering In detritus tanks, All listed here Flow velocity is kept 0.09 m/sec Detention period is kept 3 to 4 minutes Organic and inorganic materials are separated All listed here Flow velocity is kept 0.09 m/sec Detention period is kept 3 to 4 minutes Organic and inorganic materials are separated ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The sewer pipes Are designed for generating self-cleansing velocities at different discharge All listed here Should resist the wear and tear caused due to abrasion Carry sewage as gravity conduits Are designed for generating self-cleansing velocities at different discharge All listed here Should resist the wear and tear caused due to abrasion Carry sewage as gravity conduits ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The normal value of over flow rates for plain primary sedimentation tanks, ranges between 40,000 to 50,000 litres/sqm/day 25,000 to 35,000 litres/sqm/day 50,000 to 60,000 litres/sqm/day 80,000 to 100,000 litres/sqm/day 40,000 to 50,000 litres/sqm/day 25,000 to 35,000 litres/sqm/day 50,000 to 60,000 litres/sqm/day 80,000 to 100,000 litres/sqm/day ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The normal values of over flow rates for sedimentation tanks using coagulant, ranges between 50,000 to 60,000 litres/sqm/day 80,000 to 100,000 litres/sqm/day 40,000 to 50,000 litres/sqm/day 25,000 to 35,000 litres/sqm/day 50,000 to 60,000 litres/sqm/day 80,000 to 100,000 litres/sqm/day 40,000 to 50,000 litres/sqm/day 25,000 to 35,000 litres/sqm/day ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering During purification process of sewage the gas given off, is Ammonia All listed here Hydrogen Carbon dioxide Ammonia All listed here Hydrogen Carbon dioxide ANSWER DOWNLOAD EXAMIANS APP