Waste Water Engineering Lead caulked joints are used for laying Earthenware pipes I. pipes G.I. pipes Stone ware pipes Earthenware pipes I. pipes G.I. pipes Stone ware pipes ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Bio-chemical oxygen demand (BOD) for the first 20 days in generally referred to All of these Initial demand First stage demand Carbonaceous demand All of these Initial demand First stage demand Carbonaceous demand ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering For trunk and out-fall, the type of sewers generally used, is Circular shaped Standard egg shaped Parabolic shaped Horse shoe shaped Circular shaped Standard egg shaped Parabolic shaped Horse shoe shaped ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering For design of sewers, percentage of sewage discharge is assumed 70 to 75% 65 to 70% 75 to 80% 0.85 70 to 75% 65 to 70% 75 to 80% 0.85 ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The disintegrating pump in which solid matter is broken up before passing out, is None of these Centrifugal pump Pneumatic ejector Reciprocating pump None of these Centrifugal pump Pneumatic ejector Reciprocating pump ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The value of Chezy’s constant C = 157.6/(1.81 + K/ ) is used in Manning’s formula Chezy’s formula Bazin’s formula Kutter’s formula Manning’s formula Chezy’s formula Bazin’s formula Kutter’s formula ANSWER DOWNLOAD EXAMIANS APP