Power Systems In load flow studies PV bus is treated as PQ bus when phase angle become high voltage at the bus become high any of the above reactive power goes beyond limit phase angle become high voltage at the bus become high any of the above reactive power goes beyond limit ANSWER DOWNLOAD EXAMIANS APP
Power Systems Surge impedance loading of a line is increased by which of the following compensation methods? series capacitor shunt capacitor both 1 and 2 shunt reactor series capacitor shunt capacitor both 1 and 2 shunt reactor ANSWER DOWNLOAD EXAMIANS APP
Power Systems Reactance relays are used for the protection of All of these short transmission lines only medium transmission lines only long transmission lines only All of these short transmission lines only medium transmission lines only long transmission lines only ANSWER DOWNLOAD EXAMIANS APP
Power Systems For complete protection of 3-phase system from the short circuit faults minimum number of relays required are two three six one two three six one ANSWER DOWNLOAD EXAMIANS APP
Power Systems The load duration curve for a system is 8 hours 30 MW, 16 hours 25 MW and 24 hours 20 MW. The load factor will be 1.3. 0.44. 0.83. 0.25. 1.3. 0.44. 0.83. 0.25. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Mho relay is used for the protection of medium length lines. short length lines. long transmission lines. no length criterion. medium length lines. short length lines. long transmission lines. no length criterion. ANSWER DOWNLOAD EXAMIANS APP