Highway Engineering In highway construction, rolling starts from Sides and proceed to center Center and proceed to sides Any of the above One side and proceed to other side Sides and proceed to center Center and proceed to sides Any of the above One side and proceed to other side ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Most suitable material for highway embankments is organic soil silts clays granular soil organic soil silts clays granular soil ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Percentage of free carbon in bitumen is less than that in tar equal to that in tar None of these more than that in tar less than that in tar equal to that in tar None of these more than that in tar ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The fundamental factor in the selection of pavement type is availability of funds for the construction project type and intensity of traffic climatic condition subgrade soil and drainage conditions availability of funds for the construction project type and intensity of traffic climatic condition subgrade soil and drainage conditions ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The recommended grade of tar for grouting purpose is RT-1 RT-5 RT-3 RT-2 RT-1 RT-5 RT-3 RT-2 ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Creep is the Longitudinal movement of rail Lateral movement of rail Vertical movement of rail Difference in level of two rails Longitudinal movement of rail Lateral movement of rail Vertical movement of rail Difference in level of two rails ANSWER DOWNLOAD EXAMIANS APP