• HOME
  • QUIZ
  • CONTACT US
EXAMIANS
  • COMPUTER
  • CURRENT AFFAIRS
  • ENGINEERING
    • Chemical Engineering
    • Civil Engineering
    • Computer Engineering
    • Electrical Engineering
    • Mechanical Engineering
  • ENGLISH GRAMMAR
  • GK
  • GUJARATI MCQ

Process Equipment and Plant Design

Process Equipment and Plant Design
In distillation columns, bubble caps are held in place over trays by

Both B and C
Bolts
Rivets
A hold down bar

ANSWER DOWNLOAD EXAMIANS APP

Process Equipment and Plant Design
Rivets are generally specified by the

Overall length
Shank diameter
Head diameter
None of these

ANSWER DOWNLOAD EXAMIANS APP

Process Equipment and Plant Design
Cylinderical shell thickness of rotary drier is generally __________ mm.

18-22
44180
43990
43864

ANSWER DOWNLOAD EXAMIANS APP

Process Equipment and Plant Design
Liquid/petroleum fuel storage tanks are built underground (as in case of petrol pumps), when the storage capacity is less than __________ kilolitres.

85
45
30
20

ANSWER DOWNLOAD EXAMIANS APP

Process Equipment and Plant Design
In a shell and tube heat exchanger, the shortest centre to centre distance between the adjacent tubes is

Always less than the diameter of the tube
Called tube clearance
Called tube pitch
None of these

ANSWER DOWNLOAD EXAMIANS APP

Process Equipment and Plant Design
Minimum baffle spacing recommended in a shell and tube heat exchanger is equal to

25 cms
5 cms
40% of the I.D. of the shell
I.D. of the shell

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Process Equipment and Plant Design

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑