Power Systems In coal fired thermal power stations, what are the electrostatic precipitators used for? To remove dust particles setting on the bus bar conductors in the station switch yard To keep the air heaters clean To collect the dust particles from the flue gases All of these To remove dust particles setting on the bus bar conductors in the station switch yard To keep the air heaters clean To collect the dust particles from the flue gases All of these ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following is used in thermal plants Rankine cycle Joule cycle Otto cycle All of these Rankine cycle Joule cycle Otto cycle All of these ANSWER DOWNLOAD EXAMIANS APP
Power Systems The per unit impedance Z(pu) is given by ZΩ* (MVA)b/(KV)²b ZΩ* (MVA)b*100/(KV)²b ZΩ* (kVA)b/(KV)²b ZΩ* (MVA)b/((KV)²b *100) ZΩ* (MVA)b/(KV)²b ZΩ* (MVA)b*100/(KV)²b ZΩ* (kVA)b/(KV)²b ZΩ* (MVA)b/((KV)²b *100) ANSWER DOWNLOAD EXAMIANS APP
Power Systems The Y bus matrix of a 100 bus interconnected system is 90% sparse. Then find the number of non zero elements in the Y bus matrix? 1000 10 90 9000 1000 10 90 9000 ANSWER DOWNLOAD EXAMIANS APP
Power Systems The positive, negative and zero sequence per unit impedance of two generators connected in parallel are X1 = 0.12 pu, X2 = 0.096 pu and X0 = 0.036 pu. For LG fault at generator terminals (with 1 pu voltage) the positive sequence current will be 9.936 pu 7.936 pu 8.936 pu 10.936 pu 9.936 pu 7.936 pu 8.936 pu 10.936 pu ANSWER DOWNLOAD EXAMIANS APP
Power Systems Advantages of pumped storage plants is/are most economical as a peak load supply plant All of these operating time is minimum used as load frequency control most economical as a peak load supply plant All of these operating time is minimum used as load frequency control ANSWER DOWNLOAD EXAMIANS APP