Irrigation Engineering In a chute spillway, the flow is usually critical subcritical super critical uniform critical subcritical super critical uniform ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering Pick up the correct sequence of the part of a canal system from the following Heads works-branch canal-main canal distributary, minor Head works-main canal-branch canal-minor-distributary Head works-main canal-branch canal-distributary-minor Head work-distributary-branch canal-minor Heads works-branch canal-main canal distributary, minor Head works-main canal-branch canal-minor-distributary Head works-main canal-branch canal-distributary-minor Head work-distributary-branch canal-minor ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The optimum depth of kor watering for a rice crop, is 23.0 cm 19.0 cm 17.5 cm 13.5 cm 23.0 cm 19.0 cm 17.5 cm 13.5 cm ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering Seepage through foundation in an earthen dam is controlled by providing impervious cut off rock toe horizontal blanket chimney drain impervious cut off rock toe horizontal blanket chimney drain ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The main function of a diversion head works of a canal from a river, is To store water To raise water level To control floods To remove silt To store water To raise water level To control floods To remove silt ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The runoff increases with increase in permeability of soil increase in intensity of rain All of these increase in infiltration capacity increase in permeability of soil increase in intensity of rain All of these increase in infiltration capacity ANSWER DOWNLOAD EXAMIANS APP