Irrigation Engineering
Assertion A : To estimate the rainfall over a catchment, the number of raingauges required per unit area is large for hilly areas.Reason R : Rainfall gradient is steep.Select your correct answer according to the coding system given below :

Both A and R are true but R is not the correct explanation of A
A is false but R is true
Both A and R are true and R is the correct explanation of A
A is true but R is false

ANSWER DOWNLOAD EXAMIANS APP

Irrigation Engineering
The flow-mass curve is graphical representation of

Discharge and time in chronological order
Cumulative discharge, volume and time in chronological order
Discharge and percentage probability of flow being equaled or exceeded
Cumulative discharge and time

ANSWER DOWNLOAD EXAMIANS APP

Irrigation Engineering
A hydraulic jump is generally formed when a stream moving with

A hyper-critical velocity meets a stream moving with a sub-critical velocity
A hyper-critical velocity meets a stream moving with a critical velocity
A sub-critical velocity meets a stream moving with a hyper-critical velocity
A hyper-critical velocity meets a stream moving with a hyper-critical velocity

ANSWER DOWNLOAD EXAMIANS APP