Irrigation Engineering If the critical shear stress of a channel is XC, then the average value of shear stress required to move the grain on the bank is XC 0.5 XC 0.75 TC 1.33 TC XC 0.5 XC 0.75 TC 1.33 TC ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering If the R.L’s of canal bed level and high flood level of drainage are 212.0 m and 210.0 m respectively, then cross drainage work will be superpassage syphon aqueduct syphon aqueduct superpassage syphon aqueduct syphon aqueduct ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The difference in level between the top of a bank and supply level in a canal, is called Berm Height of bank Free board None of these Berm Height of bank Free board None of these ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering For diversion of flood water of rivers, the type of canal constructed, is Canal Ridge canal Inundation canal Perennial canal Canal Ridge canal Inundation canal Perennial canal ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering Hydrodynamic pressure due to earthquake acts at a height of 4H/3π below the water surface, where H is the depth of water 3H/4π below the water surface 3H/4π above the base 4H/3π above the base 4H/3π below the water surface, where H is the depth of water 3H/4π below the water surface 3H/4π above the base 4H/3π above the base ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The uplift pressure on a dam can be controlled by i) constructing cutoff under upstream face ii) constructing drainage channels bet-ween the dam and its foundation iii) by pressure grouting in foundation The corret answer is only (i) both (i) and (ii) both (i) and (iii) (i), (ii) and (iii) only (i) both (i) and (ii) both (i) and (iii) (i), (ii) and (iii) ANSWER DOWNLOAD EXAMIANS APP