Irrigation Engineering As compared to gravity dams, earthen dams require less skilled labour are less susceptible to failure are costlier require sound rock foundations require less skilled labour are less susceptible to failure are costlier require sound rock foundations ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The difference in level between the top of a bank and supply level in a canal, is called Berm Height of bank None of these Free board Berm Height of bank None of these Free board ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering A multipurpose reservoir is the one which is None of these designed for one purpose but serves more than one purpose planned and constructed to serve various purposes both (A) and (B) None of these designed for one purpose but serves more than one purpose planned and constructed to serve various purposes both (A) and (B) ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The field capacity of a soil is 25%, its permanent wilting point is 15% and specific dry unity weight is 1.5. If the depth of root zone of a crop, is 80 cm, the storage capacity of the soil, is 12 cm 10 cm 8 cm 14 cm 12 cm 10 cm 8 cm 14 cm ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The water face of the guide banks, is protected by Two man stone pitching Three man stone pitching Four man stone pitching One men stone pitching Two man stone pitching Three man stone pitching Four man stone pitching One men stone pitching ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering When surface of transpiration is submerged under water, then potential evapotranspiration is much less than evapotranspiration equal to evapotranspiration equal to or less than evapotranspi-ration much more than evapotranspiration much less than evapotranspiration equal to evapotranspiration equal to or less than evapotranspi-ration much more than evapotranspiration ANSWER DOWNLOAD EXAMIANS APP