Power Systems If all the sequence voltages at the fault point in a power system are equal, then the fault point is a LLG LG LL LLL LLG LG LL LLL ANSWER DOWNLOAD EXAMIANS APP
Power Systems The generating station suitable to operate as peak load plant is Power station. Thermal power station. Nuclear power station. Pumped storage. Power station. Thermal power station. Nuclear power station. Pumped storage. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A 3 core cable gives on test a capacitance of 3.7 µF between two cores. Find the line charging current of the cable when it is connected to 11 kV, 50 Hz system? 14.7 mA. 1.476 A. 14.76 A. 1 A. 14.7 mA. 1.476 A. 14.76 A. 1 A. ANSWER DOWNLOAD EXAMIANS APP
Power Systems If we increase the spacing between the phase conductors, the value of line inductance increase decrease None of these remains unaffected increase decrease None of these remains unaffected ANSWER DOWNLOAD EXAMIANS APP
Power Systems In a 400 kV power network, 360 kV is recorded at 400 kV bus. The reactive power absorbed by a shunt reactor for 50 MVAr, 400 kV connected at the bus is 61.73 MVAr. 45.0 MVAr. 40.5 MVAr. 55.56 MVAr. 61.73 MVAr. 45.0 MVAr. 40.5 MVAr. 55.56 MVAr. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Nuclear power plant are used as base load plants. none of above. intermediate load plants. peak load plants. base load plants. none of above. intermediate load plants. peak load plants. ANSWER DOWNLOAD EXAMIANS APP