GETCO Exam Paper (30-11-2008) Graded time lag over current relaying without directional features can be employed for protection of ring mains parallel feeders none of these radial feeders ring mains parallel feeders none of these radial feeders ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (30-11-2008) When transformers or switchgears are to be installed in a transmission line, the poles used are J type I type L type H type J type I type L type H type ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (30-11-2008) If a combination of HRC fuse and a C.B. is employed, the C.B. operates for low over load currents short circuit currents this combination is never employed in practice under all abnormal currents low over load currents short circuit currents this combination is never employed in practice under all abnormal currents ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (30-11-2008) Highest voltage for transmitting electrical power in India is (in 2008) 400 kV 550 kV 700 kV 765 kV 400 kV 550 kV 700 kV 765 kV ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (30-11-2008) The first oil refinery in India was set up at Vishakhapatnam Bombay (Mumbai) Diboi Barauni Vishakhapatnam Bombay (Mumbai) Diboi Barauni ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (30-11-2008) The Indian National Congress had its birth in the year 1885 1775 1875 1757 1885 1775 1875 1757 ANSWER DOWNLOAD EXAMIANS APP