GETCO Exam Paper (11-06-2017) Give synonym: Cease Dull Create Begin Stop Dull Create Begin Stop ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (11-06-2017) A power system needs injection of VARs at full load both peak and off-peak load off-peak load peak load full load both peak and off-peak load off-peak load peak load ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (11-06-2017) Arc in a circuit breaker is interrupted at zero current minimum voltage maximum voltage maximum current zero current minimum voltage maximum voltage maximum current ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (11-06-2017) Ferranti effect happens in transmission line when the line is long and unloaded short and loaded long and loaded none long and unloaded short and loaded long and loaded none ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (11-06-2017) The rate of rise of restriking voltage depends on the inductance of the system only the capacitance of the system only the type of circuit breaker both inductance and capacitance of the system the inductance of the system only the capacitance of the system only the type of circuit breaker both inductance and capacitance of the system ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (11-06-2017) For an overhead line, the surge impedance is taken as 100-200 Ω 20-40 Ω 500-1000 Ω 70-80 Ω 100-200 Ω 20-40 Ω 500-1000 Ω 70-80 Ω ANSWER DOWNLOAD EXAMIANS APP