Building Construction

Building Construction
For plastering the exposed brick walls, the cement sand mortar should be

1 : 6
1 : 2
1 : 4
1 : 3

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
The Auger borings are not common

In cohesive soils
None of these
In soft soils
In soils that require lateral support

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
The form Work including the props can be removed from beams, only after

3 days
14 days
7 days
21 days

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
For a wall carrying heavy load on low bearing capacity soil,

Reinforced concrete bed is provided
Both (A) and (C) of the above
Thick concrete bed is provided
Lean concrete bed is provided

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
For brick construction, the lime-sand mortar, is

1 : 1
1 : 2
1 : 4
1 : 3

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
The maximum permissible deflection of a timber beam supporting a roof, is

L/100
L/260
L/360
L/150

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Building Construction

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑