Building Construction For plastering the exposed brick walls, the cement sand mortar should be 1 : 6 1 : 2 1 : 4 1 : 3 1 : 6 1 : 2 1 : 4 1 : 3 ANSWER DOWNLOAD EXAMIANS APP
Building Construction The Auger borings are not common In cohesive soils None of these In soft soils In soils that require lateral support In cohesive soils None of these In soft soils In soils that require lateral support ANSWER DOWNLOAD EXAMIANS APP
Building Construction The form Work including the props can be removed from beams, only after 3 days 14 days 7 days 21 days 3 days 14 days 7 days 21 days ANSWER DOWNLOAD EXAMIANS APP
Building Construction For a wall carrying heavy load on low bearing capacity soil, Reinforced concrete bed is provided Both (A) and (C) of the above Thick concrete bed is provided Lean concrete bed is provided Reinforced concrete bed is provided Both (A) and (C) of the above Thick concrete bed is provided Lean concrete bed is provided ANSWER DOWNLOAD EXAMIANS APP
Building Construction For brick construction, the lime-sand mortar, is 1 : 1 1 : 2 1 : 4 1 : 3 1 : 1 1 : 2 1 : 4 1 : 3 ANSWER DOWNLOAD EXAMIANS APP
Building Construction The maximum permissible deflection of a timber beam supporting a roof, is L/100 L/260 L/360 L/150 L/100 L/260 L/360 L/150 ANSWER DOWNLOAD EXAMIANS APP