Power Systems For harnessing low variable water heads, the suitable hydraulic turbine with reaction and adjustable vanes is Francis. Pelton. Kaplan. Impeller. Francis. Pelton. Kaplan. Impeller. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Area under the daily curve divided by 24 gives units generated maximum load maximum demand average load units generated maximum load maximum demand average load ANSWER DOWNLOAD EXAMIANS APP
Power Systems Reflection coefficient of voltage is Rv (Zl - Zs)/(Zs + Zl) (Zs - Zl)/(Zs + Zl) 2Zl/(Zs + Zl) 2Zs/(Zs + Zl) (Zl - Zs)/(Zs + Zl) (Zs - Zl)/(Zs + Zl) 2Zl/(Zs + Zl) 2Zs/(Zs + Zl) ANSWER DOWNLOAD EXAMIANS APP
Power Systems The power generated by two plants are; P1 = 50 MW, P2 = 40 MW. If the loss coefficients are B11 = 0.001, B22 = 0.0025 and B12 = -0.0005, then power loss will be 4.5 MW 6.5 MW 8.5 MW 5.5 MW 4.5 MW 6.5 MW 8.5 MW 5.5 MW ANSWER DOWNLOAD EXAMIANS APP
Power Systems A gas turbine power plant is best suited for None of these. Base load. Emergency. Peak load. None of these. Base load. Emergency. Peak load. ANSWER DOWNLOAD EXAMIANS APP
Power Systems For a fixed value of complex power flow in a transmission line having a sending end voltage V, the real power loss will be proportional to 1 / V2. V2. V. 1 / V. 1 / V2. V2. V. 1 / V. ANSWER DOWNLOAD EXAMIANS APP