Highway Engineering For a constant value of coefficient of lateral friction, the value of required super-elevation increases with decrease in speed and with increase in radius of curve increase in both speed and radius of curve increase in speed and with decrease in radius of curve decrease in both speed and radius of curve decrease in speed and with increase in radius of curve increase in both speed and radius of curve increase in speed and with decrease in radius of curve decrease in both speed and radius of curve ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The maximum limit of water absorption for aggregate suitable for road construction is 1.0 % 0.4 % 0.6 % 0.8 % 1.0 % 0.4 % 0.6 % 0.8 % ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The percentage compensation in gradient for ruling gradient of 4% and horizontal curve of radius 760 m is 1 % 10% 0.1 % no compensation 1 % 10% 0.1 % no compensation ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering In case of hill roads, the extra widening is generally provided one-fourth on inner side and three-fourth on outer side of the curve equally on inner and outer sides of the curve fully on the inner side of the curve fully on the outer side of the curve one-fourth on inner side and three-fourth on outer side of the curve equally on inner and outer sides of the curve fully on the inner side of the curve fully on the outer side of the curve ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The sequence of four stages of survey in a highway alignment is preliminary survey, map study, reconnaissance and detailed survey map study, preliminary survey, reconnaissance and detailed survey map study, reconnaissance, preliminary survey and detailed survey reconnaissance, map study, preliminary survey and detailed survey preliminary survey, map study, reconnaissance and detailed survey map study, preliminary survey, reconnaissance and detailed survey map study, reconnaissance, preliminary survey and detailed survey reconnaissance, map study, preliminary survey and detailed survey ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering In the penetration macadam construction, the bitumen is Sprayed after the aggregates are spread and compacted None of these Sprayed before the aggregates are spread and compacted Premixed with aggregates and then spread Sprayed after the aggregates are spread and compacted None of these Sprayed before the aggregates are spread and compacted Premixed with aggregates and then spread ANSWER DOWNLOAD EXAMIANS APP