Irrigation Engineering Finally formed berms in canals are provided for Strengthening of banks Protection of banks erosion by the waves All of these Control of seepage losses Strengthening of banks Protection of banks erosion by the waves All of these Control of seepage losses ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering If D is the depth of scour below original bed, then the width of launching apron is generally taken as 2.5 D 1.2 D 1.5 D 2.0 D 2.5 D 1.2 D 1.5 D 2.0 D ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The normal annual precipitation at stations X, A, B and C are 700 mm, 1000 mm, 900 mm and 800 mm respectively. If the storm precipitation at three station A, B and C were 100 mm, 90 mm and 80 mm respectively, then the storm precipitation for station X will be 70mm 90 mm 105 mm 80mm 70mm 90 mm 105 mm 80mm ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering Garnett's diagrams are used for graphical solution of design equations of a canal by Gibb's theory Kennedy's theory Lacey's theory Lindlay theory Gibb's theory Kennedy's theory Lacey's theory Lindlay theory ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The depth of the crest of a scouring sluice below the crest of a head regulator, is generally kept 0.20 m 3.20 m 1.20 m 2.20 m 0.20 m 3.20 m 1.20 m 2.20 m ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The flow of water after spilling over the weir crest in chute spillway and side channel spillway respectively are At right angle and parallel to weir crest Parallel and at right angle to weir crest Parallel to weir crest in both At right angle to weir crest in both At right angle and parallel to weir crest Parallel and at right angle to weir crest Parallel to weir crest in both At right angle to weir crest in both ANSWER DOWNLOAD EXAMIANS APP