Power Systems Earthing switch is used for measuring of safety voltage protection of equipment from ground faults All of these discharging residual energies measuring of safety voltage protection of equipment from ground faults All of these discharging residual energies ANSWER DOWNLOAD EXAMIANS APP
Power Systems Main bus bar protection scheme is /are both fault bus and differential protection. none of these. fault bus protection. differential protection. both fault bus and differential protection. none of these. fault bus protection. differential protection. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The ratio of reset to pick up current for an induction cup relay is approximately 0.75. 1.35. 0.99. 1.0. 0.75. 1.35. 0.99. 1.0. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following is/are base load plants? hydro plants All of these nuclear plants thermal plants hydro plants All of these nuclear plants thermal plants ANSWER DOWNLOAD EXAMIANS APP
Power Systems A lossless power system has to serve a load of 250 MW. There are two generators(G1 and G2) in the system with cost curves C1 and C2 respectively defined as follows: C1 = PG1+0.055P²G1 C2 = 3 PG2 + 0.03 P²G2 Where PG1 and PG2 are the MW injections from generators G1 and G2 respectively. Thus, the minimum cost dispatch will be PG1 = 100 MW and PG2 = 150 MW PG1 = 0 MW and PG2 = 250 MW PG1 = 250 MW and PG2 = 0 MW PG1 = 150 MW and PG2 = 100 MW PG1 = 100 MW and PG2 = 150 MW PG1 = 0 MW and PG2 = 250 MW PG1 = 250 MW and PG2 = 0 MW PG1 = 150 MW and PG2 = 100 MW ANSWER DOWNLOAD EXAMIANS APP
Power Systems Phase shift occurs due to which of the following components? both 1 and 2 inductance conductance capacitance both 1 and 2 inductance conductance capacitance ANSWER DOWNLOAD EXAMIANS APP