Building Construction During percussion drilling The soil to a considerable depth below the bottom of the hole gets disturbed All listed here Caving or mixing of strata are caused in soft soils or cohesion-less soils Ground water observations are hindered due to entry of the slurry in the soil below the bottom of the hole The soil to a considerable depth below the bottom of the hole gets disturbed All listed here Caving or mixing of strata are caused in soft soils or cohesion-less soils Ground water observations are hindered due to entry of the slurry in the soil below the bottom of the hole ANSWER DOWNLOAD EXAMIANS APP
Building Construction In case of multi-storeyed buildings, the forms to be removed first are All the above at the same time Bottom of beams and girders Column forms Sides of beams and girders All the above at the same time Bottom of beams and girders Column forms Sides of beams and girders ANSWER DOWNLOAD EXAMIANS APP
Building Construction The form Work including the props can be removed from beams, only after 21 days 3 days 14 days 7 days 21 days 3 days 14 days 7 days ANSWER DOWNLOAD EXAMIANS APP
Building Construction Pile foundations are suitable for Water logged soils Compact soils Soft rocks Multi-storeyed buildings Water logged soils Compact soils Soft rocks Multi-storeyed buildings ANSWER DOWNLOAD EXAMIANS APP
Building Construction A floor constructed with the 4 to 6 mm marble chips, is known Chip floor Reinforced marble floor Marble floor Terrazzo floor Chip floor Reinforced marble floor Marble floor Terrazzo floor ANSWER DOWNLOAD EXAMIANS APP
Building Construction A stair should not have pitch more than 30° 25° 50° 40° 30° 25° 50° 40° ANSWER DOWNLOAD EXAMIANS APP