Building Construction During percussion drilling Caving or mixing of strata are caused in soft soils or cohesion-less soils The soil to a considerable depth below the bottom of the hole gets disturbed Ground water observations are hindered due to entry of the slurry in the soil below the bottom of the hole All listed here Caving or mixing of strata are caused in soft soils or cohesion-less soils The soil to a considerable depth below the bottom of the hole gets disturbed Ground water observations are hindered due to entry of the slurry in the soil below the bottom of the hole All listed here ANSWER DOWNLOAD EXAMIANS APP
Building Construction The maximum bearing capacity of soil is that of Black cotton soil Dry coarse sandy soil Loose fine sandy soil Hard rocks Black cotton soil Dry coarse sandy soil Loose fine sandy soil Hard rocks ANSWER DOWNLOAD EXAMIANS APP
Building Construction The Auger boring method is not suitable for Cemented soil All of these Vary soft soil Very hard soil Cemented soil All of these Vary soft soil Very hard soil ANSWER DOWNLOAD EXAMIANS APP
Building Construction To construct a 10 cm thick partition wall, you will prefer Stretcher bond Header bond English bond Flemish bond Stretcher bond Header bond English bond Flemish bond ANSWER DOWNLOAD EXAMIANS APP
Building Construction Two columns 50 cm × 50 cm and 60 cm × 60 cm carry 80 tonnes and 120 tonnes of loads respectively. The centre to centre distance between columns is 5.00 metres. The permissible bearing capacity of the soil is 20 t/m2. If the footing is not to project more than 25 cm beyond the outside of the smaller column, pick up the correct design parameters of the footing from the following: Distance of G. of the loads from the smaller column = 3.00 m Area of footing slab = 11.00 m2 All listed here The length of the foundation slab = 7.00 m Distance of G. of the loads from the smaller column = 3.00 m Area of footing slab = 11.00 m2 All listed here The length of the foundation slab = 7.00 m ANSWER DOWNLOAD EXAMIANS APP
Building Construction In jack arch floor, the rise is kept 1/12th of the span 1/6th of the span 1/8th of the span 1/10th of the span 1/12th of the span 1/6th of the span 1/8th of the span 1/10th of the span ANSWER DOWNLOAD EXAMIANS APP