Industrial Engineering and Production Management CPM requires Double time estimate Triple time estimate None of these Single time estimate Double time estimate Triple time estimate None of these Single time estimate ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management The time of completing a project in network analysis is given by following time of the critical activity meeting at the final triode Early finish Late finish Late start Early start Early finish Late finish Late start Early start ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Two alternatives can produce a product. First have a fixed cost of Rs. 2000 and a variable cost of Rs. 20 per piece. The second method has a fixed cost of Rs. 1500 and a variable cost of Rs. 30. The break even quantity between the two alternatives is 50 75 100 25 50 75 100 25 ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management What does symbol 'V' employ in work study Permanent storage Operation Inspection Delay/ temporary Storage Permanent storage Operation Inspection Delay/ temporary Storage ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management The amount deducted from the salary of workers towards employee’s provident fund is Deposited in nationalized bank Credited into reserves of company Deposited in post office Deposited in the account of worker with Provident Fund Commissioner Deposited in nationalized bank Credited into reserves of company Deposited in post office Deposited in the account of worker with Provident Fund Commissioner ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management The factors which are to be considered while developing a good wage incentive plan will include Adequate incentive Ease of administration Guaranteed basic pay All of the listed here Adequate incentive Ease of administration Guaranteed basic pay All of the listed here ANSWER DOWNLOAD EXAMIANS APP