Industrial Engineering and Production Management

Industrial Engineering and Production Management
CPM requires

None of these
Triple time estimate
Double time estimate
Single time estimate

ANSWER DOWNLOAD EXAMIANS APP

Industrial Engineering and Production Management
In PERT analysis, critical path is obtained by joining events having

Zero slack
+ve slack
Dummy activities
-ve slack

ANSWER DOWNLOAD EXAMIANS APP

Industrial Engineering and Production Management
An event is indicated on the network by

A straight line with circles at the ends
A dotted line
A number enclosed in a circle or a square
A straight line

ANSWER DOWNLOAD EXAMIANS APP

Industrial Engineering and Production Management
What does symbol 'D' imply in work study?

Transport
Inspection
Delay/temporary storage
Permanent storage

ANSWER DOWNLOAD EXAMIANS APP

Industrial Engineering and Production Management
A dummy activity in a net work diagram

Does not consume time or resources
Is an artificial activity
Is represented by a dotted line
All of these

ANSWER DOWNLOAD EXAMIANS APP

Industrial Engineering and Production Management
The difference between the time available to do the job and the time required to do the job, is known as

Event
Duration
Float
Constraint

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Industrial Engineering and Production Management

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑