Building Construction The bond in which headers and stretchers are laid in alternate courses and every stretcher course is started with a three fourth brick bat, is known as English cross bond Monk bond Rat-trap bond Dutch bond English cross bond Monk bond Rat-trap bond Dutch bond ANSWER DOWNLOAD EXAMIANS APP
Building Construction The ceiling height of a building is Between ceiling and ground level Upto roof above ground level Between ceiling and floor level Upto ceiling from the ground level Between ceiling and ground level Upto roof above ground level Between ceiling and floor level Upto ceiling from the ground level ANSWER DOWNLOAD EXAMIANS APP
Building Construction Engineering news formula for obtaining safe bearing capacity of pile for drop hammer, is, Q = (W × 2.5)/6 (S + h) Q = Wh/2.5 (S + 6) Q = Wh/6 (S + 2.5) Q = (W × 6)/h (S + 2.5) Q = (W × 2.5)/6 (S + h) Q = Wh/2.5 (S + 6) Q = Wh/6 (S + 2.5) Q = (W × 6)/h (S + 2.5) ANSWER DOWNLOAD EXAMIANS APP
Building Construction To ensure that supporting area of an offset footing of a boundary wall is fully compressive, the C.G. of load must act At the centre of the base Within the middle third of the base Neither (A), (B) nor (C) Within the middle fifth of the base At the centre of the base Within the middle third of the base Neither (A), (B) nor (C) Within the middle fifth of the base ANSWER DOWNLOAD EXAMIANS APP
Building Construction The pile which is provided with a bulb filled with concrete at its lower end, is known as Raymond pile Mac-Arthur pile Franki pile Simplex pile Raymond pile Mac-Arthur pile Franki pile Simplex pile ANSWER DOWNLOAD EXAMIANS APP