Building Construction For brick construction, the lime-sand mortar, is 1 : 4 1 : 3 1 : 1 1 : 2 1 : 4 1 : 3 1 : 1 1 : 2 ANSWER DOWNLOAD EXAMIANS APP
Building Construction In the construction of arches, sand box method is used for Centring None of these Actual laying of arch work Striking of centring Centring None of these Actual laying of arch work Striking of centring ANSWER DOWNLOAD EXAMIANS APP
Building Construction The foundations are placed below ground level, to increase All listed here Strength Workability Stability of structure All listed here Strength Workability Stability of structure ANSWER DOWNLOAD EXAMIANS APP
Building Construction The stepped structure provided for lateral support of a structure, is Buttress Retaining wall Breast wall Parapet wall Buttress Retaining wall Breast wall Parapet wall ANSWER DOWNLOAD EXAMIANS APP
Building Construction According to Rankine's formula, minimum depth of foundations, is (P/w) × [(1 + sin φ)/(1 - sin φ)]² (P/w) × [(1 - sin φ)/(1 + sin φ)]² (P/w) × [(1 + sin φ)/(1 - sin φ)] (P/2w) × [(1 - sin φ)/(1 + sin φ)]² (P/w) × [(1 + sin φ)/(1 - sin φ)]² (P/w) × [(1 - sin φ)/(1 + sin φ)]² (P/w) × [(1 + sin φ)/(1 - sin φ)] (P/2w) × [(1 - sin φ)/(1 + sin φ)]² ANSWER DOWNLOAD EXAMIANS APP