Building Construction For brick construction, the lime-sand mortar, is 1 : 4 1 : 2 1 : 1 1 : 3 1 : 4 1 : 2 1 : 1 1 : 3 ANSWER DOWNLOAD EXAMIANS APP
Building Construction In the construction of arches, sand box method is used for Actual laying of arch work None of these Striking of centring Centring Actual laying of arch work None of these Striking of centring Centring ANSWER DOWNLOAD EXAMIANS APP
Building Construction The foundations are placed below ground level, to increase Workability All listed here Stability of structure Strength Workability All listed here Stability of structure Strength ANSWER DOWNLOAD EXAMIANS APP
Building Construction The stepped structure provided for lateral support of a structure, is Parapet wall Breast wall Buttress Retaining wall Parapet wall Breast wall Buttress Retaining wall ANSWER DOWNLOAD EXAMIANS APP
Building Construction According to Rankine's formula, minimum depth of foundations, is (P/w) × [(1 - sin φ)/(1 + sin φ)]² (P/w) × [(1 + sin φ)/(1 - sin φ)]² (P/w) × [(1 + sin φ)/(1 - sin φ)] (P/2w) × [(1 - sin φ)/(1 + sin φ)]² (P/w) × [(1 - sin φ)/(1 + sin φ)]² (P/w) × [(1 + sin φ)/(1 - sin φ)]² (P/w) × [(1 + sin φ)/(1 - sin φ)] (P/2w) × [(1 - sin φ)/(1 + sin φ)]² ANSWER DOWNLOAD EXAMIANS APP