Irrigation Engineering Borrow pits should preferably be located in Fields on both sides of the canal Field on the right side of the canal Field on the left side of the canal Central half width of the section of the canal Fields on both sides of the canal Field on the right side of the canal Field on the left side of the canal Central half width of the section of the canal ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering Which of the following methods is used to estimate flood discharge based on high water marks left over in the past ? area-velocity method moving boat method ultra-sonic method slope-area method area-velocity method moving boat method ultra-sonic method slope-area method ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering If the optimum depth of kor watering for a crop is 15.12 cm, the outlet factor for the crop for four week period in hectares per cumec, is 1700 1400 1600 1500 1700 1400 1600 1500 ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The net speed under which the turbine reaches its peak efficiency is called operating speed design speed rated speed gross speed operating speed design speed rated speed gross speed ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering Effective precipitation for a crop may be defined as Total precipitation minus the loss due to evaporation Total precipitation during the crop period Total precipitation minus the loss due to infiltration Available water stored in soil within root zone of the crop Total precipitation minus the loss due to evaporation Total precipitation during the crop period Total precipitation minus the loss due to infiltration Available water stored in soil within root zone of the crop ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering For wave action in dams, the maximum height of freeboard is generally taken to be equal to (where hw is height of wave.) 0.75 hw 1.50 hw 0.5 hw 1.25 hw 0.75 hw 1.50 hw 0.5 hw 1.25 hw ANSWER DOWNLOAD EXAMIANS APP