An AC transmission line requires a VAR input:

to reduce losses
to increase power transmission
to improve stability
to improve the regulation

ANSWER DOWNLOAD EXAMIANS APP

GETCO Exam Paper (30-11-2008)
If a combination of HRC fuse and a C.B. is employed, the C.B. operates for

short circuit currents
under all abnormal currents
this combination is never employed in practice
low over load currents

ANSWER DOWNLOAD EXAMIANS APP

GETCO Exam Paper (30-11-2008)
The number of pilot wires required for protecting 3-phase transmission lines using Translay System of protection is

4
6
2
3

ANSWER DOWNLOAD EXAMIANS APP

GETCO Exam Paper (30-11-2008)
Transient stability of a power system depends on

the strength of transmission network
All of these
the short circuit ratio of generating units
fault-clearing time

ANSWER DOWNLOAD EXAMIANS APP

GETCO Exam Paper (30-11-2008)
If a power system is transiently stable, it

may be dynamically unstable
is always dynamically stable
will oscillate beyond the first swing
both (a) & (c )

ANSWER DOWNLOAD EXAMIANS APP

GETCO Exam Paper (30-11-2008)
The planning Commission was set up in

January, 1948
March,1950
September, 1947
April, 1947

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON GETCO Exam Paper (30-11-2008)

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑