Surveying After fixing the plane table to the tripod, the main operations which are needed at each plane table station are(i) Levelling(ii) Orientation(iii) CenteringThe correct sequence of these operations is (i), (ii), (iii) (i), (iii), (ii) (ii), (iii), (i) (iii), (i), (ii) (i), (ii), (iii) (i), (iii), (ii) (ii), (iii), (i) (iii), (i), (ii) ANSWER DOWNLOAD EXAMIANS APP
Surveying Latitude of a place is the angular distance from None of these Equator to the poles Greenwich to the place Equator to the nearer pole None of these Equator to the poles Greenwich to the place Equator to the nearer pole ANSWER DOWNLOAD EXAMIANS APP
Surveying Dumpy level is most suitable when fly levelling is being done over long distance the instrument is to be shifted frequently many readings are to be taken from a single setting of the instrument All of these fly levelling is being done over long distance the instrument is to be shifted frequently many readings are to be taken from a single setting of the instrument All of these ANSWER DOWNLOAD EXAMIANS APP
Surveying A metallic tape is made of cloth and wires linen steel invar cloth and wires linen steel invar ANSWER DOWNLOAD EXAMIANS APP
Surveying The principal line is the line joining the principal point and Nadir None of these Perspective centre Isocenter Nadir None of these Perspective centre Isocenter ANSWER DOWNLOAD EXAMIANS APP
Surveying The relief displacement of a building 72 m high on photograph is 7.2 mm and its top appears 10 cm away from principal point. The flying height of the camera, is 1000 m 2000 m 1500 m 500 m 1000 m 2000 m 1500 m 500 m ANSWER DOWNLOAD EXAMIANS APP