Surveying The principal line is the line joining the principal point and Nadir Isocenter Perspective centre None of these Nadir Isocenter Perspective centre None of these ANSWER DOWNLOAD EXAMIANS APP
Surveying In direct method of contouring, the process of locating or identifying points lying on a contour is called ranging horizontal control centring vertical control ranging horizontal control centring vertical control ANSWER DOWNLOAD EXAMIANS APP
Surveying The scale of a tilted photograph of focal length f, taken from an altitude H, along the plate parallel through plumb point, is f sec θ/H f/H f/H cos ½θ f/H sec θ f sec θ/H f/H f/H cos ½θ f/H sec θ ANSWER DOWNLOAD EXAMIANS APP
Surveying The two point problem and three point problem are methods of resection and orientation resection traversing orientation resection and orientation resection traversing orientation ANSWER DOWNLOAD EXAMIANS APP
Surveying With standard meridian as 82° 30' E the standard time at longitude 90° E is 8 h 30 m. The local mean time at the place will be 7 h 00 m 8 h 00 m 7 h 30 m 9 h 00 m 7 h 00 m 8 h 00 m 7 h 30 m 9 h 00 m ANSWER DOWNLOAD EXAMIANS APP
Surveying The sun's declination remains north between September 21 to December 21 March 21 to June 21 Both (A) and (B) of above June 21 to September 21 September 21 to December 21 March 21 to June 21 Both (A) and (B) of above June 21 to September 21 ANSWER DOWNLOAD EXAMIANS APP