Railway Engineering A treadle bar is used for track maintenance setting marshalling yard signals setting points and crossings interlocking points and signal track maintenance setting marshalling yard signals setting points and crossings interlocking points and signal ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The reception signal isi) outer signalii) home signaliii) starteriv) advanced starter The correct answer is (ii) and (iii) (iii) and (iv) (i)and(iv) (i) and (ii) (ii) and (iii) (iii) and (iv) (i)and(iv) (i) and (ii) ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Consider the following surveys.1. Reconnaissance survey2. Preliminary survey3. Traffic survey4. Location surveyThe correct sequence in which these surveys are conducted before the alignment of a track is finalised is 3,1,4,2 1,3,2,4 3,1,2,4 1,3,4,2 3,1,4,2 1,3,2,4 3,1,2,4 1,3,4,2 ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Switch angle depends oni) heel divergenceii) length of tongue railiii) flangeway clearanceiv) throw of switch The correct answer is (ii) and (iii) (i)and(iv) (iii) and (iv) (i) and (ii) (ii) and (iii) (i)and(iv) (iii) and (iv) (i) and (ii) ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Yellow lighthand signal indicates stop proceed cautiously None of these proceed stop proceed cautiously None of these proceed ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Consider the following statements : Automatic signaling system results in1. greater risk2. higher efficiency3. avoidance of block instruments4. higher operating cost of these statements 3 and 4 are correct 2 and 3 are correct I and 2 are correct 1 and 4 are correct 3 and 4 are correct 2 and 3 are correct I and 2 are correct 1 and 4 are correct ANSWER DOWNLOAD EXAMIANS APP