Power Systems A transmission line has self and mutual impedances of 0.8 pu and 0.2 pu. Find the positive, negative and zero sequence impedances respectively? 0.6, 0.8 and 1.2 pu 0.8, 0.6 and 1.2 pu 0.8, 0.8 and 1.2 pu 0.6, 0.6 and 1.2 pu 0.6, 0.8 and 1.2 pu 0.8, 0.6 and 1.2 pu 0.8, 0.8 and 1.2 pu 0.6, 0.6 and 1.2 pu ANSWER DOWNLOAD EXAMIANS APP
Power Systems A transmission line has impedance of (0.005 + j0.05) pu. Find the line at which maximum value of negative DC off set current is produced, if it is applied with Vm cosωt? 9.68 4.68 msec 2.63 msec 1.47 msec 9.68 4.68 msec 2.63 msec 1.47 msec ANSWER DOWNLOAD EXAMIANS APP
Power Systems Operating cost of thermal power station is is the same as that of nuclear power plant. less than that of diesel power plant. less than that of nuclear power plant. less than that of hydroelectric power plant. is the same as that of nuclear power plant. less than that of diesel power plant. less than that of nuclear power plant. less than that of hydroelectric power plant. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following methods is/are used for reactive or voltage compensation series capacitor All of these generation excitation control shunt capacitor series capacitor All of these generation excitation control shunt capacitor ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following statements is/are true? Corona is reduced by increasing the distance between the conductor All of these increasing the radius of the conductor decreasing the supply frequency increasing the distance between the conductor All of these increasing the radius of the conductor decreasing the supply frequency ANSWER DOWNLOAD EXAMIANS APP
Power Systems A thermal generating station has an installed capacity of 15 MW and supplies a daily load of 10 MW for 12 hours and 5 MW for remaining 12 hours. The plant capacity factor for the station is 0.5 1 0.75 0.6 0.5 1 0.75 0.6 ANSWER DOWNLOAD EXAMIANS APP