Irrigation Engineering A minimum of 90 cm free board is provided if the discharge in the canal is between 30 to 33 cumecs Over 60 cumecs Over 100 cumecs 30 to 60 cumecs 30 to 33 cumecs Over 60 cumecs Over 100 cumecs 30 to 60 cumecs ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering Which of the following spillways is least suitable for an earthen dam ? shaft spillway side channel spillway chute spillway ogee spillway shaft spillway side channel spillway chute spillway ogee spillway ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering Effective precipitation for a crop may be defined as Total precipitation minus the loss due to evaporation Total precipitation during the crop period Available water stored in soil within root zone of the crop Total precipitation minus the loss due to infiltration Total precipitation minus the loss due to evaporation Total precipitation during the crop period Available water stored in soil within root zone of the crop Total precipitation minus the loss due to infiltration ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering A runoff river plant is a high head scheme a low head scheme a medium head scheme None of these a high head scheme a low head scheme a medium head scheme None of these ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The aqueduct or superpassage type of works are generally used when None of these high flood drainage discharge is large and short lived high flood drainage discharge is small high flood drainage discharge is large and continues for a long time None of these high flood drainage discharge is large and short lived high flood drainage discharge is small high flood drainage discharge is large and continues for a long time ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering Pick up the correct sequence of the part of a canal system from the following Head works-main canal-branch canal-distributary-minor Head work-distributary-branch canal-minor Heads works-branch canal-main canal distributary, minor Head works-main canal-branch canal-minor-distributary Head works-main canal-branch canal-distributary-minor Head work-distributary-branch canal-minor Heads works-branch canal-main canal distributary, minor Head works-main canal-branch canal-minor-distributary ANSWER DOWNLOAD EXAMIANS APP