Power Systems A hydro power plant of run off river type should be provided with pondage so that the kinetic energy of the running water is fully utilized. operating head is controlled. firm capacity of plant is increased. pressure inside the turbine casing remains. kinetic energy of the running water is fully utilized. operating head is controlled. firm capacity of plant is increased. pressure inside the turbine casing remains. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Cheapest plant in operation and maintenance is hydroelectric. nuclear. steam power. diesel power. hydroelectric. nuclear. steam power. diesel power. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Plant capacity factor value is 1 less than 1 greater than 1 0 1 less than 1 greater than 1 0 ANSWER DOWNLOAD EXAMIANS APP
Power Systems A 3 - Φ, 33 kV oil circuit breaker is rated 1200 A, 2000 MVA, 3 s. The symmetrical breaking current is 35 kA. 104.8 kA. 3600 A. 1200 A. 35 kA. 104.8 kA. 3600 A. 1200 A. ANSWER DOWNLOAD EXAMIANS APP
Power Systems If, for a given alternator in economic operation mode, the incremental cost is given by (0.012 P + 8) Rs/MWh, dPL/dP = 0.2 and plant λ = 25, then power generation is 750 MW 1250 MW 1000 MW 1500 MW 750 MW 1250 MW 1000 MW 1500 MW ANSWER DOWNLOAD EXAMIANS APP
Power Systems Nuclear reactors usually employ fission. both of A and B. fusion. none of above. fission. both of A and B. fusion. none of above. ANSWER DOWNLOAD EXAMIANS APP