Power Systems A hydraulic turbine having rated speed of 250 rpm is connected to a synchronous generator. In order to produce power at 50 Hz, the numbers of pole are required in the generator 16. 24. 12. 6. 16. 24. 12. 6. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of following power plants will take long period in erection and installation Hydro Power Plant Gas turbine. Thermal. Nuclear. Hydro Power Plant Gas turbine. Thermal. Nuclear. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Critical mass is none of these. minimum mass of fissionable material required to sustain chain reaction. maximum mass of fissionable material required to sustain a chain reaction. a mass of fissionable material required to stop a chain reaction. none of these. minimum mass of fissionable material required to sustain chain reaction. maximum mass of fissionable material required to sustain a chain reaction. a mass of fissionable material required to stop a chain reaction. ANSWER DOWNLOAD EXAMIANS APP
Power Systems An over current relay, having a current setting of 125% connected to a supply circuit through a current transformer of ratio 400/5. The pick up value is 6.25 A 10 A 12.5 A 15 A 6.25 A 10 A 12.5 A 15 A ANSWER DOWNLOAD EXAMIANS APP
Power Systems A transmission line has 50 km operating at frequency of 500 Hz. Find the type of the line? any of the above medium transmission line long transmission line short transmission line any of the above medium transmission line long transmission line short transmission line ANSWER DOWNLOAD EXAMIANS APP
Power Systems An over current relay, having a current setting of 125% connected to a supply circuit through a current transformer of ratio 500/5. The plug setting multiplier for a fault current of 5 kA is 2 6 5 8 2 6 5 8 ANSWER DOWNLOAD EXAMIANS APP