Power Systems A generated station has a maximum demand of 30 MW, a load factor of 60% and a plant capacity factor of 50%. The reserve capacity of the plant is 5 MW 10 MW 6 MW 12 MW 5 MW 10 MW 6 MW 12 MW ANSWER DOWNLOAD EXAMIANS APP
Power Systems A penstock is used as a condition between the turbine and discharge drain. the dam and the turbine in a hydro station. the heat ex-changer and the turbine in nuclear power plant. none of above. the turbine and discharge drain. the dam and the turbine in a hydro station. the heat ex-changer and the turbine in nuclear power plant. none of above. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The ground capacitance existing between transmission line and ground is 4µF. Find the inductive reactance of the peterson coil for compensation of arcing grounds? 265.25 Ω 855.26 Ω 0.844 Ω 625.35 Ω 265.25 Ω 855.26 Ω 0.844 Ω 625.35 Ω ANSWER DOWNLOAD EXAMIANS APP
Power Systems Highest pressure generating pump inside the thermal plant is low pressure heater All of these boiler feed pump high pressure heater low pressure heater All of these boiler feed pump high pressure heater ANSWER DOWNLOAD EXAMIANS APP
Power Systems In a 400 kV power network, 360 kV is recorded at 400 kV bus. The reactive power absorbed by a shunt reactor for 50 MVAr, 400 kV connected at the bus is 55.56 MVAr. 40.5 MVAr. 45.0 MVAr. 61.73 MVAr. 55.56 MVAr. 40.5 MVAr. 45.0 MVAr. 61.73 MVAr. ANSWER DOWNLOAD EXAMIANS APP
Power Systems For some given transmission line the expression for voltage regulation is given by (Vs - Vr)/Vr *100%. Hence, this must be a short line this expression is true for any line this may either be a medium line or short line None of these this must be a short line this expression is true for any line this may either be a medium line or short line None of these ANSWER DOWNLOAD EXAMIANS APP