Power Systems A generated station has a maximum demand of 30 MW, a load factor of 60% and a plant capacity factor of 50%. The reserve capacity of the plant is 6 MW 10 MW 12 MW 5 MW 6 MW 10 MW 12 MW 5 MW ANSWER DOWNLOAD EXAMIANS APP
Power Systems A generator has a rating of 10 MVA, 5 kV has a reactance of 0.02 pu. Find the reactance at a new base values of 50 MVA, 10 kV? 0.25 0.02 0.05 0.025 0.25 0.02 0.05 0.025 ANSWER DOWNLOAD EXAMIANS APP
Power Systems With reference to hydrometer station, the graphical representation of the discharge as function of time is known as Load duration curve. Hydro-graph. Monograph. Hectograph. Load duration curve. Hydro-graph. Monograph. Hectograph. ANSWER DOWNLOAD EXAMIANS APP
Power Systems For harnessing low variable water heads, the suitable hydraulic turbine with reaction and adjustable vanes runners is Pelton Kaplan Francis Impeller Pelton Kaplan Francis Impeller ANSWER DOWNLOAD EXAMIANS APP
Power Systems Attenuation occurs due to resistance inductance both 1 and 3 conductance resistance inductance both 1 and 3 conductance ANSWER DOWNLOAD EXAMIANS APP
Power Systems The time taken by the turbine to fall to 0 rpm speed from 3000 rpm is called damping time. settling time. stopping time. coasting time. damping time. settling time. stopping time. coasting time. ANSWER DOWNLOAD EXAMIANS APP