Irrigation Engineering A current meter is used to measure the discharge depth of flow of water velocity of flow of water None of these discharge depth of flow of water velocity of flow of water None of these ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering Disposal of extra excavated earth of canals, is utilized to provide a spoil bank on Both sides Left side Right side All listed here Both sides Left side Right side All listed here ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering A counter berm is A horizontal benching provided on the outside slope A vertical benching provided on the outer edge of the bank A horizontal benching provided on the inside slope A vertical benching provided on the inner edge of the bank A horizontal benching provided on the outside slope A vertical benching provided on the outer edge of the bank A horizontal benching provided on the inside slope A vertical benching provided on the inner edge of the bank ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering If L is total length of a canal in kilometers, P is total perimeter of its lining in metres and C is the cost of lining per square metre, the additional expenditure involved on lining, is 100 PLC PC/100L PLC/1000 PL/1000C 100 PLC PC/100L PLC/1000 PL/1000C ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering A deep well is always deeper than a shallow well both (A) and (B) has more discharge than a shallow well is weaker structurally than a shallow well is always deeper than a shallow well both (A) and (B) has more discharge than a shallow well is weaker structurally than a shallow well ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering If it rains between 2 P.M. and 3 P.M. and the entire basin area just starts contributing water at 3 P.M. to the outlet, then time of concentration will be 30 minutes 60 minutes 20 minutes 15 minutes 30 minutes 60 minutes 20 minutes 15 minutes ANSWER DOWNLOAD EXAMIANS APP