System Analysis and Design Which of the following would not be a major deliverable of the structured systems analysis phase. prototype model None of these data flow diagrams data dictionaries entity relationship diagrams prototype model None of these data flow diagrams data dictionaries entity relationship diagrams ANSWER DOWNLOAD EXAMIANS APP
System Analysis and Design The black box concept is based on the assumption(s) that; the relationship between the inputs and output is stable None of these All of these the suprasystem is stable black boxes are dependent or environments the relationship between the inputs and output is stable None of these All of these the suprasystem is stable black boxes are dependent or environments ANSWER DOWNLOAD EXAMIANS APP
System Analysis and Design The main purpose of the system investigation phase is to produce a feasibility report None of these a requirement report a design report All of these a feasibility report None of these a requirement report a design report All of these ANSWER DOWNLOAD EXAMIANS APP
System Analysis and Design Which of the following is not a part of a Data Flow Diagram? Data store arrow None of these process represented by a bubble circle (circle) disk storage Data store arrow None of these process represented by a bubble circle (circle) disk storage ANSWER DOWNLOAD EXAMIANS APP
System Analysis and Design A couple: is represented by a line joining two modules is a data item that moves from one module to another None of these None of these means that the upper module has the capability of calling the lower module is represented by a line joining two modules is a data item that moves from one module to another None of these None of these means that the upper module has the capability of calling the lower module ANSWER DOWNLOAD EXAMIANS APP
System Analysis and Design The approach used in top-down analysis and and design is None of these to identify a top level function and then create a hierarchy of lower level modules and components All of these to prepare flowcharts after programming has been completed to identify the top level functions by combining many smaller components into a single entity. None of these to identify a top level function and then create a hierarchy of lower level modules and components All of these to prepare flowcharts after programming has been completed to identify the top level functions by combining many smaller components into a single entity. ANSWER DOWNLOAD EXAMIANS APP