Power Systems Which of the following transmission line is most practically used in load flow analysis? either 1 or 2 Nominal T nether 1 nor 2 Nominal ∏ either 1 or 2 Nominal T nether 1 nor 2 Nominal ∏ ANSWER DOWNLOAD EXAMIANS APP
Power Systems Efficiency of thermal power plant can be taken as turbine efficiency. generator efficiency. efficiency of thermal cycle. product of efficiencies of all stages. turbine efficiency. generator efficiency. efficiency of thermal cycle. product of efficiencies of all stages. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Frequencies must be same in which of the following line to exchange the power from one place to other place ? both 1 and 2 No need of same frequency for exchange of power Synchronous line Asynchronous line both 1 and 2 No need of same frequency for exchange of power Synchronous line Asynchronous line ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following power plants can generate power at unpredictable or uncontrollable time Cooling tower. Wind turbine. Condenser. Pulverising unit. Cooling tower. Wind turbine. Condenser. Pulverising unit. ANSWER DOWNLOAD EXAMIANS APP
Power Systems In a 400 kV power network, 360 kV is recorded at 400 kV bus. The reactive power absorbed by a shunt reactor for 50 MVAr, 400 kV connected at the bus is 55.56 MVAr. 61.73 MVAr. 40.5 MVAr. 45.0 MVAr. 55.56 MVAr. 61.73 MVAr. 40.5 MVAr. 45.0 MVAr. ANSWER DOWNLOAD EXAMIANS APP
Power Systems IF the time of operation of a relay for unity TMS is 10 sec then the time of operation for 0.5 TMS is 20 sec. 10 sec. 5 sec. none of these. 20 sec. 10 sec. 5 sec. none of these. ANSWER DOWNLOAD EXAMIANS APP