DGVCL Exam Paper (12-06-2016) Which of the following is not a part of transformer installation? Exciter Buchholz Relay Conservator Breather Exciter Buchholz Relay Conservator Breather ANSWER EXPLANATION DOWNLOAD EXAMIANS APP Exciter is used in alternator for field supply.
DGVCL Exam Paper (12-06-2016) For 11 kV line the capacitance per km per phase will be of the order of: 0.1 Farad 0.01 Farad 1 Farad 0.01 microF 0.1 Farad 0.01 Farad 1 Farad 0.01 microF ANSWER DOWNLOAD EXAMIANS APP
DGVCL Exam Paper (12-06-2016) _____ are used where it is necessary to control a circuit by a low power signal. None of these Relays Electric Motor Transformer None of these Relays Electric Motor Transformer ANSWER DOWNLOAD EXAMIANS APP
DGVCL Exam Paper (12-06-2016) If the displayed system time and date is wrong, you can reset it using : Control panel Desk top Task bar Menu bar Control panel Desk top Task bar Menu bar ANSWER DOWNLOAD EXAMIANS APP
DGVCL Exam Paper (12-06-2016) Gujarat State Electricity Corp. Ltd. (GSECL) is a _____ Distribution Company Regulatory Commission Power Generation Company Transmission Company Distribution Company Regulatory Commission Power Generation Company Transmission Company ANSWER EXPLANATION DOWNLOAD EXAMIANS APP Distribuition Companies: PGVCL, MGVCL, UGVCL, DGVCLTransmission: GETCOGeneration: GSECL
DGVCL Exam Paper (12-06-2016) Which of the following 3-phase connection of a transformer causes interference with the neighbouring communication lines: Delta-Star Star-Star Star-Delta Delta-Delta Delta-Star Star-Star Star-Delta Delta-Delta ANSWER DOWNLOAD EXAMIANS APP