Which of the following is not a factor in the failure of the systems developments projects?

size of the company
continuation of a project that should have been cancelled
inadequate user involvement
failure of systems integration

ANSWER DOWNLOAD EXAMIANS APP

System Analysis and Design
Rapid prototyping proves the quality of a design by

having a data flow diagram
having a program simulate the real system
None of these
both (a) and (b)
having the system analyst present an overview of the design to users, programmers, and consultants